Change Order Filter
in progress
C
Cierra Brinkerhoff
I would like the ability to filter in the Item Status tab. When we have a CO, we have to scroll through the entire list of materials and load all of it which, for some large projects, takes 15-20 minutes to get to the bottom of the list. I would like the capability to filter by CO Number so I can select and download certain change orders without loading the entire materials list. When we download CSV files, loading the whole list takes way too long.
R
Ryan Schmidt
in progress